EVS Saar - Sewage Treatment Works - Homburg

Design capacity: 75.000 HV

Dry weather flow:

18.750 m³/d


Wastewater treatment:


  • Mechanical pre-treatment
  • Rainwater pre-treatment
  • Aerobic biological preparation
       with continuous process
  • Anaerobic sludge treatment
  • Sludge dehydration

  • Type of Advertisment:

    Product mix


    Production costs:

    17.650.000,-


    Construction period:

    2001 - 2005


    Size of order working group
    elementis consult / SBU Homburg:

    General management: elementis consult


    • Part VII HOAI: engineering work
    • Standard benefits
      • 1, 2, 6, 7, 9
    • Extra benefits
      • Regional
        construction monitoring § 57 HOAI

    • Part IX HOAI: technichal equipment
    • Standard benefits
      • 1- 4, 7- 9

    • Part II HOAI: Open Space Planning
    • Standard benefits
      • 1- 4, 7- 9

    • Part VII HOAI: engineering work
    • Extra benefits
      • Regional
        construction monitoring:
        Mechanical engineering


    Order sum elementis consult:

    557.000,-


    Processing period:

    1996 – 2006